We built and added a new control panel to an existing Earthsafe network and validated the operation of the existing system. We found two of four generators would go into alarm on low fuel before the automatic controls would start the supply transfer pumps. Level probes were physically adjusted to start the fuel transfer pumps before the generator furnished controls would go into alarm. Leak detectors were also added to the existing system, then tested and validated.
|
|
 |
|