This project was successfully completed
within an aggressive 5 month construction schedule. Our fuel system supports
six 2.2 megawatt generators with two 25,000 gallon underground storage tanks,
redundant pumps, redundant power supplies and redundant piping paths. All
piping on the project is double contained. The fuel control system involves
redundant PLC master and submaster PLC at each generator for a true 8N control
system. Leak detectors have individual custom sequences based on the operating
conditions of the generators. The project has a custom-assembled vacuum
system to ensure much higher reliability and uptime than the standard components. Standard
vacuum systems average a once per month callback. Ours average only one
per two years. We have a number of standard installation practices that
make for a much higher uptime than industry standard. Call us and we will
be happy to demonstrate what makes us different (better)!
|
|
 |
|