This project added to an existing Data Center in Palo Alto. We installed double contained welded steel pipe and the leak detection and level monitoring system. The main tank and day tanks were existing as furnished by others. A wall-mount remote fill in the ally was installed as well as a fuel cleaning system.
|
|
 |
|